See ALL PROJECTS

Suburban Rail Loop

Transformational

Public transport project

Direct interface

With Melbourne Airport

More than 8000

Direct jobs created

SRL East from Cheltenham to Box Hill will connect major employment, health, education and retail destinations in Melbourne’s east and south east. The line will slash travel times, connect people travelling on the Gippsland corridor and building it will create up to 8000 direct jobs. Construction started in June 2022 and trains will be running by 2035.

Transaction Advisory: IAG is engaged as Transaction Advisor for the SRL. The IAG team works closely with members of the SRL project teams to deliver concurrent major work package procurements including Initial Works and Early Works (IWEW) Package (Managing Contractor), two Tunnelling Packages (Incentivised Target Cost Model), line-wide Infrastructure, Systems, Rolling Stock and O&M Package (Delivery Alliance and O&M Franchise) and two Stations Packages (Alliances).

Commercial Advisory: IAG provided commercial and delivery support to several SRLA packages. For the early works package this included contract administration support, including payment claim review and change support. For the tunnels and civils packages, IAG provided cross-functional support in relation to change management and assessment, including supporting contractor engagement and enhanced project performance analysis through project controls and reporting.

Delivery and Engineering:IAG provided key engineering and project management services for the $30 billion SRL East project including constructability advisory services, independent assessments and planning services.

We conducted reviews of existing civil constructability reports and expanded assessments to include rail systems. Our team identified construction staging requirements, developed options for station disruption at Box Hill, Glen Waverley and Cheltenham and ensured access points met construction demands.

Through workshops we fostered cooperative relationships and worked closely with SRLA and technical advisors to transform data into actionable insights.

Within four weeks, we delivered a comprehensive framework for occupation, constructability and staging to enable SRLA to prepare for Multi-Criteria Analysis (MCA) workshops. Transformational public transport project. Direct interface with Melbourne Airport. More than 8000 direct jobs created.

Send us your Enquiry